A special Study Day for the Friends of George Street included a special tour of the building site  today.
Project Manager and Site Manager, Mike and Ian, took the FOGS around the site explaining the work that had been done so far and what was going to happen as work proceeded to fulfil Age UK Oldham plans.
The value of the tented enclosure was clearly demonstrated as we walked about on the roof scaffolding in the dry and safely despite the rain outside.
To see a video of the visit click here.
,
Site induction and safety talk.
Issuing of hard hats and high viz jackets. 
In the basement cellar, walking on the recently poured concrete floor.
The main chapel floor with the temporary floor above.
In the amongst the roof trusses standing on the temporary work floor.
The roof, looking at where a new stone gutter will be made and fitted
to replace the cast iron gutter which had been used to replace
original stone one, on the George Street elevation.