Week 51 - Day 246
The floor boarding all had large gaps between each of the boards. To fix the problem each board has been lifted and relaid, closing up the gaps. A new fillet has then been introduced at the edge to make up the total of all the gaps removed.
Information posted by the Friends of George Street about events and activities at the former Independent Methodist Chapel at George Street, Oldham by Age UK Oldham. The early posts describe the works to conserve, restore and adapt this Grade ll* Listed Building betwee 2012-13. Restoration works were supported by a grant from the HLF, with match funding from the Andrew Lloyd Webber Challenge Fund, English Heritage and the Architectural Heritage Fund as well as Viridor Credits and Lloyds Bank.
Showing posts with label gallery floor. Show all posts
Showing posts with label gallery floor. Show all posts
Monday, 17 February 2014
Monday, 10 February 2014
Day 244 - Work to Flooring
Week 50 - Day 244
The carpenters were back today to address some issues with the floor boards.
To prevent sawdust entering the pipe organ it was covered in plastic sheeting.
The carpenters were back today to address some issues with the floor boards.
To prevent sawdust entering the pipe organ it was covered in plastic sheeting.
Thursday, 10 October 2013
Day 169 - Repairing Floorboards
Week 35 - Day 169
Attention turned to the floor today. Piecing new boards in to replace damaged older ones on the gallery.
Attention turned to the floor today. Piecing new boards in to replace damaged older ones on the gallery.