Friday, 15 November 2013

Day 195 - Relaying Blocks to Rear

Week 39 - Day 195
At the rear in Jackson Pit the blocks were being relaid today having lifted them, broken up the concrete, laid new drainage and sewerage and made good the ground.


Friday, 8 November 2013

Day 190 - Things Get Worse Before They Get Better

Week 39 - Day 190
You can't get in through the back door now.
The works to connect up the drainage get down to the the connecting phase, unfortunately its been raining again this week!




Wednesday, 6 November 2013

Day 188 - Breaking Ground for Drainage

Week 39 - Day 188
The area below where the cabins stood have been broken up to allow the new drainage services to be put in.





Monday, 4 November 2013

Day 186 - The Importance of Good Drainage

Week 39 - Day 186
There had always been a problem with drainage and damp on the George Street elevation.
We have tried to tackle this four ways. By tanking and coating the inside of the walls, dry lining, raising a lip around the access ways to the windows and doors and putting a drainage pipe under the floor to carry away any rainwater that collects in the wells.
The drainage pipes were put in whilst the floor was being lifted earlier in the woks programme. Today the drain was connected up.