Week 13 - Day 60
A section of the outside wall on the Jackson Pit elevation was cut away in the past to enable a flue to be inserted from a kitchen range to a chimney inserted between two windows. Where the flue passed between the wall and the chapel floor it was constructed of plaster and there was little supporting the wall above. See below how a new concrete beam is inserted to take the weight of the wall above.
The flue itself had been built within the cavity wall of the original construction.
Information posted by the Friends of George Street about events and activities at the former Independent Methodist Chapel at George Street, Oldham by Age UK Oldham. The early posts describe the works to conserve, restore and adapt this Grade ll* Listed Building betwee 2012-13. Restoration works were supported by a grant from the HLF, with match funding from the Andrew Lloyd Webber Challenge Fund, English Heritage and the Architectural Heritage Fund as well as Viridor Credits and Lloyds Bank.
Showing posts with label cavity wall. Show all posts
Showing posts with label cavity wall. Show all posts
Tuesday, 30 April 2013
Friday, 22 March 2013
Day 35 - Cavity Wall
Week 7 - Day 35
The inner bricks started to be cleaned off and the loose ones removed so they can be rebuilt before the wall is re-plastered. The cavity wall construction can be seen as the inner skin of bricks are removed. Sections of the wall have been re-built before. You can see the concrete block over the window, which replaces the original timber one.
The inner bricks started to be cleaned off and the loose ones removed so they can be rebuilt before the wall is re-plastered. The cavity wall construction can be seen as the inner skin of bricks are removed. Sections of the wall have been re-built before. You can see the concrete block over the window, which replaces the original timber one.