Week 44 - Day 219
The handrail to the stairs from the chapel floor to the gallery were completed and returned today, cleaned, stained and polished.
Information posted by the Friends of George Street about events and activities at the former Independent Methodist Chapel at George Street, Oldham by Age UK Oldham. The early posts describe the works to conserve, restore and adapt this Grade ll* Listed Building betwee 2012-13. Restoration works were supported by a grant from the HLF, with match funding from the Andrew Lloyd Webber Challenge Fund, English Heritage and the Architectural Heritage Fund as well as Viridor Credits and Lloyds Bank.
Showing posts with label gallery. Show all posts
Showing posts with label gallery. Show all posts
Thursday, 19 December 2013
Monday, 2 December 2013
Day 206 - Spindles
Week 42 - Day 206
New spindles to match original surviving ones that were located around the stairwell from the chapel to the gallery.
New spindles to match original surviving ones that were located around the stairwell from the chapel to the gallery.
Tuesday, 26 November 2013
Wednesday, 13 November 2013
Wednesday, 30 October 2013
Day 183 - Primer Paint to Vestry and Gallery
Week 38 - Day 183
Starting to prime woodwork in the chapel today. The vestry was a later addition within the chapel is is a lower quality wood compared to earlier fitments such as the pews and pulpit.
Starting to prime woodwork in the chapel today. The vestry was a later addition within the chapel is is a lower quality wood compared to earlier fitments such as the pews and pulpit.
![]() |
| Undercoat to the woodwork of the vestry. |
![]() |
| Preparation of the woodwork to the vestry and the gallery. |
Location:
Oldham, UK
Thursday, 17 October 2013
Day 174 - All the bits-and-bobs for the Gallery
Week 36 - Day 174
New timbers for the gallery fronts with boxes to cover up the metal uprights that have had to be created to provide stability for the front to meet modern safety regulations. Can't afford anyone collapsing the front and ending up falling to the chapel floor below!
New timbers for the gallery fronts with boxes to cover up the metal uprights that have had to be created to provide stability for the front to meet modern safety regulations. Can't afford anyone collapsing the front and ending up falling to the chapel floor below!
Thursday, 10 October 2013
Day 169 - Repairing Floorboards
Week 35 - Day 169
Attention turned to the floor today. Piecing new boards in to replace damaged older ones on the gallery.
Attention turned to the floor today. Piecing new boards in to replace damaged older ones on the gallery.
Thursday, 3 October 2013
Day 164 - New Plaster - Old Plaster with Decoration
Week 34 - Day 164
The new plaster was applied today to meet the old plaster that still has the stencil decoration found during the stripping out earlier in the works programme.
The new plaster was applied today to meet the old plaster that still has the stencil decoration found during the stripping out earlier in the works programme.
![]() |
| New lime plaster applied up to the surviving original plaster with its surviving wall painting decoration at George Street Chapel, Oldham. |
![]() |
| New lime plaster applied up to the surviving original plaster with its surviving wall painting decoration in the NE corner of the gallery floor of George Street Chapel, Oldham. |
![]() |
| First coat of lime plaster being applied to the internal wall of George Street Chapel, Oldham on the west, Jackson Pit side of the Chapel. |
Labels:
gallery,
lime plaster,
wall plaster
Location:
Oldham, UK
Monday, 30 September 2013
Day 161 - More Plastering
Week 34 -Day 161
Lime plastering continues on walls and laths.
Lime plastering continues on walls and laths.
The ceiling above the side pews, under the gallery has been re-lathed and is now being lime plastered.
The inner wall on the Jackson Pit side includes a corbeled section of flue for the carrying of fumes and smoke from the central fireplace in the cellar. This flue was inserted from the inside of the building by cutting into the outside wall and creating a flue where none had previously existed. A chimney was then created through the roof, but inside the line of the stone gutter. See earlier photo of this feature from the roof side -
Labels:
gallery,
lath and plaster,
lime plaster
Location:
Oldham, UK
Tuesday, 24 September 2013
Day 157 - Plastering Walls above the gallery
Week 33 - Day 157
Lime plaster, first coast, applied to walls above the gallery level today.
Top coat applied within the vestry. Note the construction of the dumb waiter which will carry food and plates to the gallery.
The wall rising up from the cellar where the new staircase has been inserted is being lined with plaster board.
Lime plaster, first coast, applied to walls above the gallery level today.
Top coat applied within the vestry. Note the construction of the dumb waiter which will carry food and plates to the gallery.
The wall rising up from the cellar where the new staircase has been inserted is being lined with plaster board.
Monday, 16 September 2013
Day 151 - Access Scaffolding Removed
Week 32 - Day 151
The temporary scaffolding that provided the working floor above the gallery floor and provided access for work on the ceiling was removed today. The view of the ceiling can now be seen from the chapel floor and means that restoration work scan proceed to the gallery and the pews.
Withe the scaffolding removed the windows can now start to be replaced.
The temporary scaffolding that provided the working floor above the gallery floor and provided access for work on the ceiling was removed today. The view of the ceiling can now be seen from the chapel floor and means that restoration work scan proceed to the gallery and the pews.
Withe the scaffolding removed the windows can now start to be replaced.
Labels:
ceiling,
gallery,
roof trusses
Location:
Oldham, UK
Thursday, 21 March 2013
Day 34 - Removing the Gallery Fronts
Week 7 - Day 34
The Gallery fronts are being removed. These are modern replacements of the originals. The materials are of poor quality and we will replace with a proper replica that more closely resembles the original.
The Gallery fronts are being removed. These are modern replacements of the originals. The materials are of poor quality and we will replace with a proper replica that more closely resembles the original.
![]() |
| The Gallery fronts are being removed at George Street Chapel. |
Labels:
gallery
Location:
Oldham, UK
Tuesday, 26 February 2013
Day 17 - Support Structure for Gallery Revealed
Week 4 - Day 17
The lath and plaster is being removed from underneath the gallery Floor revealing the support structure.
Also the new set of toilets behind the lobby entrance have been removed.
The lath and plaster is being removed from underneath the gallery Floor revealing the support structure.
Also the new set of toilets behind the lobby entrance have been removed.
Thursday, 16 August 2012
Gallery Investigations
Small opening up operations took place below the Gallery Floor to check on the connection between the support beams and the external wall. We needed to see if there was any evidence of rot where the beams were attached to the wall, and if there was any evidence for how the pews were arranged.
![]() |
| Lifting the floorboards of the Gallery |
![]() |
| The supporting beams below the Gallery floor. |