Thursday 16 August 2012

Gallery Investigations

Small opening up operations took place below the Gallery Floor to check on the connection between the support beams and the external wall. We needed to see if there was any evidence of rot where the beams were attached to the wall, and if there was any evidence for how the pews were arranged.

Lifting the floorboards of the Gallery
The supporting beams below the Gallery floor.

No comments:

Post a Comment