Paint Investigations

During the investigations to the cellar, gallery and roof samples were taken from various parts of the chapel to look at the history of its paintwork, by scrapping down sections.

Photographs of the chapel show it with a heavy wood-grained effect paintwork. The paint scrapes show that the golden/yellow graining covered a brown tone stain or paint, which was used over the original wood surface. The last owner had covered the graining effect with grey and black paint.


In the 1960's the chapel was given a brighter feel with the front of the gallery being painted a bright blue. The blue paint was then covered recently by the same grey and black paint used by the previous owner in the 1990's.

Newly inserted wood can be clearly differentiated from the original wood of the gallery front,.
The original wood at the bottom of the picture is covered by the woodgrain effect,
and then the blue paint scheme.
All is overpainted by the grey and black paint of the 1990's. 
We have also been looking at the organ pipes. The recent grey paint seems to be covering over earlier pipe work decorative features. The conservation of such paintwork requires specialist investigations and will need to be given further attention.
Close inspection of the organ pipes.
Careful removal of the recent grey paint uncovers purple stripes and gothic lettering, some with bright gold and red highlights, which will be looked at in greater detail by an expert conservator.
This great photograph of the chapel shows it after the blue paint had been used to brighten up the interior. However, the refurbished chapel will be given a fresh paint scheme that will suite the new use by Age UK, but reflect its Independent Methodist heritage. Over the coming months we will be visiting some heritage chapel sites to help decide what kind of scheme will suit the new new use for the 21st century.
 

Roof Investigations

Most of the roof structure is hidden from view behind a ceiling of lath and plaster.
There is a small inspection hatch in the north end of the chapel, which allowed access for a camera and lighting so that an inspection could be made of the upper part of the roof truss.
The construction is described as a King Post, or Crown Post structure, where a post rises vertically from a crossbeam to the apex of the roof.
A diagram of the roof will be posted later, and it will be exposed briefly during refurbishment as the slates are removed during conservation works.

Roof structure looking south (George St side).
Roof structure looking south (Jackson Pit side).

Gallery Investigations

Small opening up operations took place below the Gallery Floor to check on the connection between the support beams and the external wall. We needed to see if there was any evidence of rot where the beams were attached to the wall, and if there was any evidence for how the pews were arranged.

Lifting the floorboards of the Gallery
The supporting beams below the Gallery floor.

Cellar Investigations

In July two holes were dug in the cellar to investigate what was beneath the stone slabs.
we knew that the previous owner had lifted the slabs and relaid them, but we did not know if they had been  relaid  on concrete, with a damp-proof membrane, or just on the original materials. Damp rising between eth slabs suggested that there was not a good damp-proof system in place, and that if there had been one it probably needed some attention.

Ash fill below the stone slabs in the cellar.




















The investigation has shown that the stone slabs were not replaced on a concrete base, and that there was no damp-proof membrane. The cleanliness of the fill suggested that it might be the original material from when the chapel was first constructed. Structural engineers from the Morton Partnership were also happy with the foundations that they could see below the gable wall.

Indications were also showed that the material was deep enough to allow for the insertion of an underfloor heating system.