Friday, 22 March 2013

Day 35 - Cavity Wall

Week 7 - Day 35
The inner bricks started to be cleaned off and the loose ones removed so they can be rebuilt before the wall is re-plastered. The cavity wall construction can be seen as the inner skin of bricks are removed. Sections of the wall have been re-built before. You can see the concrete block over the window, which replaces the original timber one.

No comments:

Post a Comment