Friday, 10 May 2013

Day 66 - Pouring the Concrete Foundation Slab in the Basement

Week 14 - Day 66
The concrete slab was poured today, encapsulating the steel re-inforceing mesh. Above this will be insulation, underfloor heating, screed and the then the stone floor slabs will be bedded in top. The stone slabs have been cleaned of-site and are ready to be returned as soon as the floor is ready to lay.