Tuesday, 18 February 2014

Day 247 - Fixing Floors

Week 51 - Day 247
The chapel floor is the centre of attention for the next few days. The cracks between the boards are being filled in and loose boards are being screwed to the floor. The heads of the screws will be covered over by wooden plugs. Cracked boards which cannot be repaired will be lifted and replaced. Floor boards of this age are wider than modern boards, so it is important for the feel and look of a chapel of this age to retain as much of the original material as possible.

No comments:

Post a Comment