Monday, 9 September 2013

Day 146 - First Coat of Plaster to the South Wall

Week 31 - Day 146
The first coat of wall plaster has been applied to the south gable to the side of the two windows positioned either side of where the organ was placed.
Now that the roof is on and the windows have started to be replaced an air blower has had to be brought in to increase ventilation so that the plaster will dry more quickly.
The stone front to the inserted chimney flue from one of the kitchen ranges can be seen in the central section between the windows.










No comments:

Post a Comment