Work proceeds on the roof, the ceiling, the chapel floor, the woodwork and in the cellar.
The two chimney stacks are almost completely rebuilt. |
Repointing to the end gable facing David Street. |
Work continues to put up the laths that will hold the lime plaster ceiling. |
Boarding is taped down to the chapel floor to protect the original floor boards. |
The pulpit and front of the pews are sanded down now that the wood graining has been removed. |
The damp-proof tanking band is applied to the lower sections of the outer walls in the cellar. |
No comments:
Post a Comment