The block work in the cellar is getting higher and a new concrete
lintel has been put on.
Information posted by the Friends of George Street about events and activities at the former Independent Methodist Chapel at George Street, Oldham by Age UK Oldham. The early posts describe the works to conserve, restore and adapt this Grade ll* Listed Building betwee 2012-13. Restoration works were supported by a grant from the HLF, with match funding from the Andrew Lloyd Webber Challenge Fund, English Heritage and the Architectural Heritage Fund as well as Viridor Credits and Lloyds Bank.
Tuesday, 11 June 2013
Monday, 10 June 2013
Sunday, 9 June 2013
Video Update of Restoration Works - to Friday 7 June
A tour of the chapel, starting at the chimneys and roof and moving down through the chapel to the cellar to look at the stage of restoration reached by Friday, 7th June.
Friday, 7 June 2013
Day 83 - Ceiling at South End of Chapel
Week 18 - Day 83
Nice view today of the ceiling at the south end of the chapel over the pulpit and the organ.
The laths await their covering in lime plaster. Note the retention of the original plaster at the vertical wall where the ceiling height changes.
Nice view today of the ceiling at the south end of the chapel over the pulpit and the organ.
The laths await their covering in lime plaster. Note the retention of the original plaster at the vertical wall where the ceiling height changes.
![]() |
| Ceiling at the south end of George Street Chapel over the pulpit and organ. The new ceiling laths await their coating of lime plaster. |
Labels:
ceiling
Location:
Oldham, UK
Wednesday, 5 June 2013
Day 82 - Insulation Below Underfloor Heating
Week 18 - Day 82
Insulation started to be laid today which sits between the concrete slab and the heating coils of the underfloor heating system.
Insulation started to be laid today which sits between the concrete slab and the heating coils of the underfloor heating system.
Tuesday, 4 June 2013
Monday, 3 June 2013
Day 80 - Work on Windows
Week 18 - Day 80
With the work to install the ceiling laths now completed, refurbishment of the windows in the temporary roof space has been taken up again. The glass was removed earlier, along with the paint - so now work can be carried out to replace rotten elements of the frames.
With the work to install the ceiling laths now completed, refurbishment of the windows in the temporary roof space has been taken up again. The glass was removed earlier, along with the paint - so now work can be carried out to replace rotten elements of the frames.
Labels:
windows
Location:
Oldham, UK