Week 48 - Day 240
The organ is now being tuned and all the pipes should be fitted on Monday.
Information posted by the Friends of George Street about events and activities at the former Independent Methodist Chapel at George Street, Oldham by Age UK Oldham. The early posts describe the works to conserve, restore and adapt this Grade ll* Listed Building betwee 2012-13. Restoration works were supported by a grant from the HLF, with match funding from the Andrew Lloyd Webber Challenge Fund, English Heritage and the Architectural Heritage Fund as well as Viridor Credits and Lloyds Bank.
Friday, 31 January 2014
Thursday, 30 January 2014
Day 239 - Fitted Cupboard
Week 48 - Day 239
The doors were fixed to the built in cupboard we have reconstructed in-between the kitchen range and the wall. Only awaiting painting now.
The doors were fixed to the built in cupboard we have reconstructed in-between the kitchen range and the wall. Only awaiting painting now.
Wednesday, 29 January 2014
Day 238 - Electrics for the Pipe Organ
Week 48 - Day 238
The electrician returned today to connect up all the wires.
The hatch over the electric air blower was started to be constructed.
The electrician returned today to connect up all the wires.
The hatch over the electric air blower was started to be constructed.
Tuesday, 28 January 2014
Day 237 - Reproduction Furniture
Week 48 - Day 237
Whilst the pipe organ continues to be re-built two pieces of furniture were built in the cellar dwellings. These are reproductions based on example sin the next door cellar of 56, George Street.
There is a cupboard built into the alcove between the kitchen range on the David Street elevation and a partition / draught excluder that acts as a shelving unit in the middle cellar dwelling, formerly 14, Jackson Pit.
Both will be painted in a green paint to match the original next door.
Whilst the pipe organ continues to be re-built two pieces of furniture were built in the cellar dwellings. These are reproductions based on example sin the next door cellar of 56, George Street.
There is a cupboard built into the alcove between the kitchen range on the David Street elevation and a partition / draught excluder that acts as a shelving unit in the middle cellar dwelling, formerly 14, Jackson Pit.
Both will be painted in a green paint to match the original next door.
Monday, 27 January 2014
Day 236 - More Pipes
Week 48 - Day 236
Todays work involved connecting up more pipes, this time for moving air from the bellows to the speaking pipes which play the notes.
Todays work involved connecting up more pipes, this time for moving air from the bellows to the speaking pipes which play the notes.
Friday, 24 January 2014
Day 235 - Big Pipes - Small Pipes
Week 47 - Day 235
The shutters dividing pipes are in place. Smaller pipes and one big facade pipe in place.
Small ones to begin getting al the racks filled - the front pipe just to show off and see what it will look like when completed - awesome I think is the word.
The shutters dividing pipes are in place. Smaller pipes and one big facade pipe in place.
Small ones to begin getting al the racks filled - the front pipe just to show off and see what it will look like when completed - awesome I think is the word.
Wednesday, 22 January 2014
Day 233 - Organ Progress
Week 47 - Day 233
The void in the middle of the casework will soon have all the pipes put back into their respective racks.
The void in the middle of the casework will soon have all the pipes put back into their respective racks.
Tuesday, 21 January 2014
Day 232 - Electrics to the Pipe Organ
Week 47 - Day 232
Electrics connected to the pipe organ to enable the lights to work for the organist and to turn the electric blower on and off.
Electrics connected to the pipe organ to enable the lights to work for the organist and to turn the electric blower on and off.
Monday, 20 January 2014
Day 231 - Casework for Pipe Organ
Week 47 - Day 231
The second manual started to be connected today, and the casework began to be constructed around it.
The second manual started to be connected today, and the casework began to be constructed around it.
Friday, 17 January 2014
Day 230 - Supporting Structures for Pipe Organ
Week 46 - Day 230
The supporting structure to hold the shutters and support the pipes went up today.
The supporting structure to hold the shutters and support the pipes went up today.
Thursday, 16 January 2014
Day 229 - Continuing Work Inside the Pipe Organ
Week 46 - Day 229
All the focus of work to re-assemble the pipe organ are taking place inside the framework.
All the focus of work to re-assemble the pipe organ are taking place inside the framework.
Wednesday, 15 January 2014
Day 228 - First Manual in Place
Tuesday, 14 January 2014
Day 227 - Recruiting New FOGS
Week 46 - Day 227
Maggie Hurley, Community Development Officer for Age UK Oldham started recruitment for new FOGS today with a photo for the local press on the front steps of the chapel. Also there was Roy Lees who has been undertaking local research into the chapel and its cellar dwelling tenants.
Maggie Hurley, Community Development Officer for Age UK Oldham started recruitment for new FOGS today with a photo for the local press on the front steps of the chapel. Also there was Roy Lees who has been undertaking local research into the chapel and its cellar dwelling tenants.
Monday, 13 January 2014
Day 226 - Two Manuals and a Wind Chest
Week 46 - Day 226
Both manuals were put in place today and the wind chest and supports for the pipes.
Both manuals were put in place today and the wind chest and supports for the pipes.
Friday, 10 January 2014
Thursday, 9 January 2014
Day 224 - Rebuilding the Pipe Organ
Week 45 - Day 224
Having brought all the parts of the organ back to Oldham from Huddersfield the instrument starts to get rebuilt.
Having brought all the parts of the organ back to Oldham from Huddersfield the instrument starts to get rebuilt.
Wednesday, 8 January 2014
Tuesday, 7 January 2014
Monday, 6 January 2014
Day 221 - Starting to Rebuild the Pipe Organ
Subscribe to: