Week 41 - Day 205
Continuing the preparation of all the woodwork.
The stained top rail for the safety rail awaits completion on Monday.
More preparation of the wooden rails in front of the pulpit.
Information posted by the Friends of George Street about events and activities at the former Independent Methodist Chapel at George Street, Oldham by Age UK Oldham. The early posts describe the works to conserve, restore and adapt this Grade ll* Listed Building betwee 2012-13. Restoration works were supported by a grant from the HLF, with match funding from the Andrew Lloyd Webber Challenge Fund, English Heritage and the Architectural Heritage Fund as well as Viridor Credits and Lloyds Bank.
Friday, 29 November 2013
Thursday, 28 November 2013
Wednesday, 27 November 2013
Day 203 - Everything Including the Kitchen Sink
Tuesday, 26 November 2013
Monday, 25 November 2013
Saturday, 23 November 2013
FOGS Visit to Englesea Brook Chapel and Museum of Primitive Methodism
Today the Friends of George Street visited the Museum of Primitive Methodism at Englesea Brook Chapel, Cheshire.
It was a frosty morning at -3 degrees but we had a warm welcome by Dr Jill Barber the Project Director.
It was a frosty morning at -3 degrees but we had a warm welcome by Dr Jill Barber the Project Director.
![]() |
| The new wheelchair access constructed at Englesea Brook. |
![]() |
| The front door into the chapel with the gallery above. |
![]() |
| View from the pews in the gallery with the pulpit and harmonium. |
Friday, 22 November 2013
Day 200 - Fixing the Front Step
Week 40 - Day 200
The supporting structure for the front steps needed completely replacing. The iron bar was corroded. With a new steel girder in place the brickwork to support the stone steps to the front door can now be built up. The stone is ready to be put in place next week.
The supporting structure for the front steps needed completely replacing. The iron bar was corroded. With a new steel girder in place the brickwork to support the stone steps to the front door can now be built up. The stone is ready to be put in place next week.