Week 13 - Day 60
A section of the outside wall on the Jackson Pit elevation was cut away in the past to enable a flue to be inserted from a kitchen range to a chimney inserted between two windows. Where the flue passed between the wall and the chapel floor it was constructed of plaster and there was little supporting the wall above. See below how a new concrete beam is inserted to take the weight of the wall above.
The flue itself had been built within the cavity wall of the original construction.
Information posted by the Friends of George Street about events and activities at the former Independent Methodist Chapel at George Street, Oldham by Age UK Oldham. The early posts describe the works to conserve, restore and adapt this Grade ll* Listed Building betwee 2012-13. Restoration works were supported by a grant from the HLF, with match funding from the Andrew Lloyd Webber Challenge Fund, English Heritage and the Architectural Heritage Fund as well as Viridor Credits and Lloyds Bank.
Tuesday, 30 April 2013
Monday, 29 April 2013
Day 59 - The Variety of Works to the Roof, Walls, Ceiling, Chapel Floor, Woodwork and the Cellar
Week 14 - Day 59
Work proceeds on the roof, the ceiling, the chapel floor, the woodwork and in the cellar.
Work proceeds on the roof, the ceiling, the chapel floor, the woodwork and in the cellar.
![]() |
| The two chimney stacks are almost completely rebuilt. |
![]() |
| Repointing to the end gable facing David Street. |
![]() |
| Work continues to put up the laths that will hold the lime plaster ceiling. |
![]() |
| Boarding is taped down to the chapel floor to protect the original floor boards. |
![]() |
| The pulpit and front of the pews are sanded down now that the wood graining has been removed. |
![]() |
| The damp-proof tanking band is applied to the lower sections of the outer walls in the cellar. |
Labels:
ceiling,
cellar,
chapel floor,
paint,
roof
Location:
Oldham, UK
Friday, 26 April 2013
Day 58 - A Hymn Book Found under a Pew
Wek 13 - Day 58
A paperback hymn book was found underneath one of the pews that have to be removed to make way for the new stairs and lift.
The hymn book is Sacred Songs and Solos and New Hymns and Solos 888 pieces by Ira D. Sankey
It belonged to Mrs Marlor.
Read about Sankey and Moodey from the biography, My life and the story of the gospel hymns and of sacred songs and solo written by Ira D. Sankey (1840-1908) 1906.
A paperback hymn book was found underneath one of the pews that have to be removed to make way for the new stairs and lift.
The hymn book is Sacred Songs and Solos and New Hymns and Solos 888 pieces by Ira D. Sankey
It belonged to Mrs Marlor.
Read about Sankey and Moodey from the biography, My life and the story of the gospel hymns and of sacred songs and solo written by Ira D. Sankey (1840-1908) 1906.
![]() |
| Hymn Book found at George Street Chapel, Oldham. Sacred Songs and Solos Ira D, Sankey |
Thursday, 25 April 2013
Day 57 - Ceiling laths and roof insulation
Week 13 - Day 57
The work to put the ceiling laths in place continues.
Also today, an experiment in placing the roof insulation in place. This has to be put in place between the ceiling and the roof slates, but can't rest on top of the laths as the insulation will be laid before the plaster in spread through the laths to key it in place. So, the insulation needs to be laid over a mesh of string with clearance between it and the top of the laths!
With the laths in place some detail of the purlins becomes clearer to see from the top - but is hidden from view from below!
The work to put the ceiling laths in place continues.
Also today, an experiment in placing the roof insulation in place. This has to be put in place between the ceiling and the roof slates, but can't rest on top of the laths as the insulation will be laid before the plaster in spread through the laths to key it in place. So, the insulation needs to be laid over a mesh of string with clearance between it and the top of the laths!
With the laths in place some detail of the purlins becomes clearer to see from the top - but is hidden from view from below!
![]() |
| One bay of laths completed in the roof of George Street Chapel, Oldham. |
![]() |
| Roof insulation between the rafters and over the ceiling laths. |
![]() |
| Insulation laid between rafters over the ceiling laths at George Street Chapel, Oldham |
![]() |
| Underside view of the purlin arrangement. Detail being hidden by the ceiling laths. |
![]() |
| Top view of the tusked purlins at George Street Chapel. |
![]() |
| A choice of different types of slate for the roof for George Street Chapel, Oldham. |
Location:
Oldham, UK
Wednesday, 24 April 2013
Day 56 - Making Good - flue arch, door. chimney
Week 13 - Day 56
Today elements started to be finished off, closed off and sealed.
The brick arch that formed the horizontal flue from the central kitchen range and the flue built into the rear wall was re-mortared today. This involved the making of a timber template to make sure that arch was supported and rebuilt to match its original form. All this brickwork will be hidden from view after the plasterers do their job and cover it with lime plaster.
A doorway which gave access to one of the cellar dwellings from George Street has been sealed up. This area is to be adapted to provide the new toilet facilities in the cellar. Unfortunately, they have to be put somewhere to enable the chapel to have modern facilities for its new users.
On the roof the chimneys have been sealed to prevent damp penetration into the stacks and the roof.
Today elements started to be finished off, closed off and sealed.
The brick arch that formed the horizontal flue from the central kitchen range and the flue built into the rear wall was re-mortared today. This involved the making of a timber template to make sure that arch was supported and rebuilt to match its original form. All this brickwork will be hidden from view after the plasterers do their job and cover it with lime plaster.
A doorway which gave access to one of the cellar dwellings from George Street has been sealed up. This area is to be adapted to provide the new toilet facilities in the cellar. Unfortunately, they have to be put somewhere to enable the chapel to have modern facilities for its new users.
On the roof the chimneys have been sealed to prevent damp penetration into the stacks and the roof.
| Doorway entrance from George Street to one of the cellar dwellings now sealed up. |
| Timber formwork used to support the brick arch during restoration. |
![]() |
| Capping sealing the top of the chimney stacks. |
Location:
Oldham, UK
Tuesday, 23 April 2013
Day 55 - Pottery Finds
Monday, 22 April 2013
Day 54 - Removing Paint from Doors
Week 12 - Day 54
More paint stripping this week. This time it is the doors that get full attention. Meanwhile it is possible to get a feel for what the pulpit and choir pews might look like if it is decided just to give them a light stain rather than a paint finish.
More paint stripping this week. This time it is the doors that get full attention. Meanwhile it is possible to get a feel for what the pulpit and choir pews might look like if it is decided just to give them a light stain rather than a paint finish.